One of our regular customers in the food processing business had a cooler floor that was failing(previously installed by a competitor)they are required to have sanitary floors. They called us and we had a crew work over the weekend bringing floor back into service.
They are building a new plant and will be moving in a year or less, they said replace only failing portion as the rest of floor should last a year.
Floor was demoed to a point where existing was down tight,concrete and existing were diamond ground. Cementious urethane was installed over existing and the infill.
Cooler was shut down Friday night and back in service on Monday morning,no loss of production.