We got a call and looked at this job. The existing underlayment was installed over a copper shielding and had started to fail. The underlayment needed to be removed and shielding needed to remain un-damaged. After careful planning to perform this work in a functioning hospital we started the demolition and preparation for 3/4"-1" of K15 underlayment. The owner had bond tests taken so it wouldnt have to be shut down again. All of the failures during testing were in the concrete below the copper.The finished floor was flat, smooth, level and well bonded.